Edgars Creek

Werribee River Wetland & Drain
Paynesville

Werribee River Wetland & Drain
Stratford – Traill Estate

Werribee River Wetland & Drain
Cloverton Estate

Werribee River Wetland & Drain
Mansfield WMF

Werribee River Wetland & Drain
Wonthaggi WWTP

Werribee River Wetland & Drain
Veolia Soil Washing Facility

Werribee River Wetland & Drain
Stamford Park Wetlands

Werribee River Wetland & Drain
Colac Basin

Colac Basin Construction of 465ML Colac Basin No. 5 which was delivered under the stringent OH&S, quality and environmental requirements of Barwon Water. Works included placement of zoned fills (zone a and b materials), filtration layers and gravity support sections; Installation of numerous concrete structures (including an eleven meter high outlet structure); Installation of extensive DICL pipework and associated fittings ranging from 150-600mm diameter; Installation of a suspended steel gantry way and associated structural steel works; Placement of geosynthetics and lagoon rock lining; Completion of stringent geotechnical testing; and Electrical control work. MORE SERVICES Ready to Start Your Project? Partner with MaxBright for a stress-free earthmoving experience. Established in 1985, our Melbourne-based team has over four decades of experience delivering on-time and on-budget projects. Contact us today to bring your vision to life. GET STARTED
Lower Dandenong Creek Remodelling & Wetland

LOWER Dandenong Creek Remodelling and Wetland The Lower Dandenong Creek remodelling was an extensive wetland project completed for Melbourne Water. These major in-stream works required detailed site management, coordination of major excavation fronts and works within difficult site conditions. Works included; Bulk earthworks; Placement of extensive clay liners; Decommissioning and removal of existing concrete assets; Installation of new concrete assets inclusive of extensive maintenance tracks, high flow weirs and numerous fish ladders/passages; Installation of wetland controls structure inclusive of penstocks, transfer pipework and associated pits; Riffle structures; Sediment basin; Diversion channel; Rock beaching; Hydroseeding and hydromulching; and Fencing. MORE SERVICES Ready to Start Your Project? Partner with MaxBright for a stress-free earthmoving experience. Established in 1985, our Melbourne-based team has over four decades of experience delivering on-time and on-budget projects. Contact us today to bring your vision to life. GET STARTED