Ouyen Construction of a series of 60ML waste water treatment lagoons in Ouyen.   Works consisted of; Bulk earthworks; Clay liner placed under Level 1 control; Pipework; Placement of geofabric and rock lining.   Works were constructed in drought conditions using dam insitu material requiring extensive moisture conditioning to achieve moisture and compaction requirements under Level 1 control. MORE SERVICES Ready to Start Your Project? Partner with MaxBright for a stress-free earthmoving experience. Established in 1985, our Melbourne-based team has over four decades of experience delivering on-time and on-budget projects. Contact us today to bring your vision to life. GET STARTED

Aurora

Aurora Construction of 280 megalitre waste water storage lagoon for the Vic Urban Aurora project. The project consisted of Bulk earthworks in clay and hard rock. Rock excavated on site was re-used for embankment protection, Stripping and separately stockpiling of all topsoil from the storage site, Excavation of clay material and  basalt rock; Construction of embankments, spreading of crushed rock, load cart and placement of 100mm clay liner. Construction of a crushed rock access road around the crest of the embankments. Construction of rock beaching with geotextile underlay; Installation of topsoil around the outside embankments. Creating of mounts north of existing extent of works and south of northern stockpile. MORE SERVICES Ready to Start Your Project? Partner with MaxBright for a stress-free earthmoving experience. Established in 1985, our Melbourne-based team has over four decades of experience delivering on-time and on-budget projects. Contact us today to bring your vision to life. GET STARTED

Colac

Colac Construction of 465ML Colac Basin No. 5 which was delivered under the stringent OH&S, quality and environmental requirements of Barwon Water. Works included placement of zoned fills (zone a and b materials), filtration layers and gravity support sections; Installation of numerous concrete structures (including an eleven meter high outlet structure); Installation of extensive DICL pipework and associated fittings ranging from 150-600mm diameter; Installation of a suspended steel gantry way and associated structural steel works; Placement of geosynthetics and lagoon rock lining; Completion of stringent geotechnical testing; and Electrical control work.   MORE SERVICES Ready to Start Your Project? Partner with MaxBright for a stress-free earthmoving experience. Established in 1985, our Melbourne-based team has over four decades of experience delivering on-time and on-budget projects. Contact us today to bring your vision to life. GET STARTED

Melton RWP

Additional On-Site Storage & Interconnecting Pipework – Greater Western Water