Construction of 280 megalitre waste water storage lagoon for the Vic Urban Aurora project.
The project consisted of Bulk earthworks in clay and hard rock. Rock excavated on site was re-used for embankment protection, Stripping and separately stockpiling of all topsoil from the storage site, Excavation of clay material and basalt rock; Construction of embankments, spreading of crushed rock, load cart and placement of 100mm clay liner. Construction of a crushed rock access road around the crest of the embankments. Construction of rock beaching with geotextile underlay; Installation of topsoil around the outside embankments. Creating of mounts north of existing extent of works and south of northern stockpile.
Partner with MaxBright for a stress-free earthmoving experience. Established in 1985, our Melbourne-based team has over four decades of experience delivering on-time and on-budget projects. Contact us today to bring your vision to life.