Veolia Soil Washing Facility

Werribee River Wetland & Drain
Colac Basin

Colac Basin Construction of 465ML Colac Basin No. 5 which was delivered under the stringent OH&S, quality and environmental requirements of Barwon Water. Works included placement of zoned fills (zone a and b materials), filtration layers and gravity support sections; Installation of numerous concrete structures (including an eleven meter high outlet structure); Installation of extensive DICL pipework and associated fittings ranging from 150-600mm diameter; Installation of a suspended steel gantry way and associated structural steel works; Placement of geosynthetics and lagoon rock lining; Completion of stringent geotechnical testing; and Electrical control work. MORE SERVICES Ready to Start Your Project? Partner with MaxBright for a stress-free earthmoving experience. Established in 1985, our Melbourne-based team has over four decades of experience delivering on-time and on-budget projects. Contact us today to bring your vision to life. GET STARTED
Lower Dandenong Creek Remodelling & Wetland

LOWER Dandenong Creek Remodelling and Wetland The Lower Dandenong Creek remodelling was an extensive wetland project completed for Melbourne Water. These major in-stream works required detailed site management, coordination of major excavation fronts and works within difficult site conditions. Works included; Bulk earthworks; Placement of extensive clay liners; Decommissioning and removal of existing concrete assets; Installation of new concrete assets inclusive of extensive maintenance tracks, high flow weirs and numerous fish ladders/passages; Installation of wetland controls structure inclusive of penstocks, transfer pipework and associated pits; Riffle structures; Sediment basin; Diversion channel; Rock beaching; Hydroseeding and hydromulching; and Fencing. MORE SERVICES Ready to Start Your Project? Partner with MaxBright for a stress-free earthmoving experience. Established in 1985, our Melbourne-based team has over four decades of experience delivering on-time and on-budget projects. Contact us today to bring your vision to life. GET STARTED
Mary Street Wetlands

Mary Street Wetlands Construction of wetland including bulk earthworks and associated works. Works included: Tree removal; Bulk earthworks including stripping of topsoil, trimming of wetland, clay lined sediment pond, interim bypass channel, control of pollution and sediment laden runoff, respreading of topsoil; Drainage including pipe, box culvert and pits; Rock riffle and rock beaching; Access track; and hydroseeding. Contract extended for landscaping works including jute mat, bird netting and planting of 84,668 plants. MORE SERVICES Ready to Start Your Project? Partner with MaxBright for a stress-free earthmoving experience. Established in 1985, our Melbourne-based team has over four decades of experience delivering on-time and on-budget projects. Contact us today to bring your vision to life. GET STARTED
Timbertop

TIMBERTOP Wetland construction including; Implementing environmental controls comprising of erosion protection, silt fence for water runoff, construction of drains and sedimentation dams; Disposal of all surface rock, vegetation, fences and rubbish; Stripping of topsoil; Disposal of excess material; excavation and compaction of clay liner; Erosion protecting; Crushed rock maintenance track; Concrete industrial driveways and weir; Rock beaching; Concrete sleeper walls; Drainage pipes, pits and end wall; Dewatering desludging and removal of contaminated material; Hydroseeding of site to ensure regrowth; Full site rehabilitation. MORE SERVICES Ready to Start Your Project? Partner with MaxBright for a stress-free earthmoving experience. Established in 1985, our Melbourne-based team has over four decades of experience delivering on-time and on-budget projects. Contact us today to bring your vision to life. GET STARTED
Mt Atkinson

Section 5 Drain Wetland & Waterway
Werribee River

Lower Section 8 Wetland