21 day/night Full Rail Occupation, Level Crossing Removal Grange Road, Alphington.
Works included: Stripping and loading of ballast, rail formation, capping and residual soils direct to road trucks for disposal; Removal and segregation for disposal of existing asphalt, kerb, concrete and footpath; Excavation and removal of CAT C in-situ material as per EPA guidelines; Excavation of solid rock cut and trimming of solid rock walls to design; Placement of geofabric on top of subgrade; Import and placement of 40mm & 20mm rock for capping layers; Compliance with Level 1 Geotechnical supervision; and Drainage installation works within the rail corridor.
Partner with MaxBright for a stress-free earthmoving experience. Established in 1985, our Melbourne-based team has over four decades of experience delivering on-time and on-budget projects. Contact us today to bring your vision to life.