(Metropolitan Roads Program Alliance)
24/7 works during road and rail occupations as part of the Clyde Road Level Crossing Removal Project in Berwick.
Rail – Works included stripping of ballast; excavation to subgrade level, subgrade preparation and remediation; installation of formation – structural fill and capping layers.
Road – Bulk excavation of 50,000 tonnes to subgrade level; detailed trim inclusive of shotcrete wall preparation; subgrade preparation, installation of drainage blanket.
Partner with MaxBright for a stress-free earthmoving experience. Established in 1985, our Melbourne-based team has over four decades of experience delivering on-time and on-budget projects. Contact us today to bring your vision to life..