24/7 works during road and rail occupations as part of the Clyde Road Level Crossing Removal Project in Berwick.

 

Rail – Works included stripping of ballast; excavation to subgrade level, subgrade preparation and remediation; installation of formation – structural fill and capping layers.

 

Road – Bulk excavation of 50,000 tonnes to subgrade level; detailed trim inclusive of shotcrete wall preparation; subgrade preparation, installation of drainage blanket.

 